MEB are providing Mechanical, Electrical and Public Health installations to Mizen which consists of 33 luxury apartments.
The project commenced in April 2018 and consists of a new build 14 storey mixed use scheme with commercial/retail area.
Project Overview At A Glance
-Heating and cooling installations
-Mechanical ventilation and heat recovery installation
-Domestic hot and cold water installation
-Supply and Fix Sanitaryware.
-Water supply installation.
-Soil and waste installation
-All above ground drainage.
-Dry rising main installation
-Sprinkler System Installation
-Rainwater installation.
-Landlords power & Lighting
-Small power to dwellings to include wiring, cables, distribution boxes, sockets, switches, TV points, lighting, smoke alarms, heat alarms, balcony lighting, etc.
-Incoming mains and sub-main installation to distribution boards
-Access control system
-Smoke Ventilation system
-Fire Alarm System
-Emergency Lighting
-Communal TV / Satellite System